RECENTLY COMPLETED PROJECTS |
---|
* PA Division :- Various sanction track renewal works .2) Replacement of MS Sleeper & stone ballast by RCC ooring & RCC sleeper at HPCL siding Loni (Deposit Work) 3) Repairs & Maintenance of CCH Yard within CONCER Depot line no.1,2 & shunting neck (Deposit work) 4) Deep Screening & De-stressing under SSE/ PW/BVQ (SNE Rd 1 & 1 TKR RD 1 & track Circuited Area =2500m BVNR RD 1 & track Circuitedarea = 3800m,Total 11900m) |
* PA –MRJ section :- Cess WIDENING at KM 95.10 TO 96.10 and km 114.40 to 116.15 Total 2.75 Kms under ADEN (S) PA section |
* Improvement of the formation by providing side drain,cess repairs and trolly refuges under ADEN (S) PA Section |
* Miscellaneous P.way works under ADEN (S) LNL section |
* 1) LNL-DD section : TBR Work 80.03 Kms. 2)Pune-Lonavala section: CTR (P) 6.644 Kms |
* Change of Traction in Daund Yard |
* Daund –Baramati section :TRR (P)8.04 Kms (Balance work).TBR on Pune –Daund Section by BCM (Location 196.00 to 197.85(UP)=1.85KMS ,247.002 TO 254.80 (UP)=8.30 kms 256.20 to 264.50 (DN)=8.30 Kms & CTR (P) location 280.602 to 221.15 (DN) = 12.055 Kms .Total 38.80 Kms (Balance work) 3) TBR- 11.852 kms of LNL-PA section (DN RD)174.1 to 176.7 = 2.6 , 184.783 to 186.2=1.487 ,(UP RD) 163.7 TO 166.715 = 3.015, 175.75 TO 178.8 = 3.05 , 183.1 TO 184.8 = 1.7, Total = 11.852 kms . 4) Repairs to track using deep screening by BCM on PA-LNL section. |