RECENTLY COMPLETED PROJECTS
* PA Division :- Various sanction track renewal works .2) Replacement of MS Sleeper & stone ballast by RCC ooring & RCC sleeper at HPCL siding Loni (Deposit Work) 3) Repairs & Maintenance of CCH Yard within CONCER Depot line no.1,2 & shunting neck (Deposit work) 4) Deep Screening & De-stressing under SSE/ PW/BVQ (SNE Rd 1 & 1 TKR RD 1 & track Circuited Area =2500m BVNR RD 1 & track Circuitedarea = 3800m,Total 11900m)
* PA –MRJ section :- Cess WIDENING at KM 95.10 TO 96.10 and km 114.40 to 116.15 Total 2.75 Kms under ADEN (S) PA section
* Improvement of the formation by providing side drain,cess repairs and trolly refuges under ADEN (S) PA Section
* Miscellaneous P.way works under ADEN (S) LNL section 
* 1) LNL-DD section : TBR Work 80.03 Kms. 2)Pune-Lonavala section: CTR (P) 6.644 Kms
* Change of Traction in Daund Yard 
* Daund –Baramati section :TRR (P)8.04 Kms (Balance work).TBR on Pune –Daund Section by BCM (Location 196.00 to 197.85(UP)=1.85KMS ,247.002 TO 254.80 (UP)=8.30 kms 256.20 to 264.50 (DN)=8.30 Kms & CTR (P) location 280.602 to 221.15 (DN) = 12.055 Kms .Total 38.80 Kms (Balance work) 3) TBR- 11.852 kms of LNL-PA section (DN RD)174.1 to 176.7 = 2.6 , 184.783 to 186.2=1.487 ,(UP RD) 163.7 TO 166.715 = 3.015, 175.75 TO 178.8 = 3.05 , 183.1 TO 184.8 = 1.7, Total = 11.852 kms . 4) Repairs to track using deep screening by BCM on PA-LNL section.

ON GOING PROJECTS 
* Miscellaneous P. Way works under Senior Section Engineer, P.Way, Daund (South) under Assistant Divisional Engineer, Kurduwadi (B G) sub division.
* Provision of Chord line connection Pune Daund main line with Daund – Manmad main line of Daund station
* TRR (P) 4.598 kms (From kms 148 to 152.598 UP Rd. 2) DD-BRMT sec – TRR (P) 6.16 kms (From kms 281.35 to 287.01, 290.70 to 291.00, 309.80 to 310). 3) PA-DD– TBR 18.14 kms : PA-DD (UP RD- 197.86 to 208.00 & 211.00 to 219.00)
* 1) GPR Yard Elimination of non-standard elimination of non-standard scissorcrosses over number 31 A & B / 32 A& B on wooden sleeper by modication inconnecting turnouts. 
* PUNE-Extension of platform for 24/26 coaches and removal of DDS 
* Extension of high level UP and DN platform for avoiding double halt at
Chinchwad DN platform 64m (BB End)
* Extension of High level UP and DN platform for avoiding double halt at Shivajinagar UP platform 122m & Dn 95 m (BB End) under ADEN (S) LNL. 2)Extension of High Level Platform for avoiding double halt DN Platform (BB END) 175 m at Dapodi under ADEN (S) LNL